page 1
page 2
page 3
page 4
page 5
page 6
page 7
page 8
page 9
page 10
page 11
page 12
page 13
page 14
page 15
page 16
page 17
page 18
page 19
page 20
page 21
page 22
page 23
page 24
page 25
page 26
page 27
page 28
page 29
page 30
page 31
page 32
page 33
page 34
page 35
page 36
page 37
page 38
page 39
page 40
page 41 page 42
page 43
page 44
page 45
page 46
page 47
page 48
page 49
page 50
page 51
page 52
page 53
page 54
page 55
page 56
page 57
page 58
page 59
page 60
page 61
page 62
page 63
page 64
page 65
page 66
page 67
page 68
page 69
page 70
page 71
page 72
page 73
page 74
page 75
page 76
page 77
page 78
page 79
page 80
page 81
page 82
page 83
page 84
page 85
page 86
page 87
page 88
page 89
page 90
page 91
page 92
page 93
page 94
page 95
page 96
page 97
page 98
page 99
page 100
page 101
page 102
page 103
page 104
page 105
page 106
page 107
page 108
page 109
page 110
page 111
page 112
page 113
page 114
page 115
page 116
page 117
page 118
page 119
page 120
page 121
page 122
page 123
page 124
page 125
page 126
page 127
page 128
page 129
page 130
page 131
page 132
page 133
page 134
page 135
page 136
page 137
page 138
page 139
page 140
page 141
page 142
page 143
page 144
< prev - next > Energy Mechanical Power tech_guidelines_gravity_goods_ropeway (Printable PDF)
step 3
Figure 20
step 4
Execution and Installation
perpendicular to each other are obtained. These
pegs should be kept intact throughout the
construction period for the reference. Now, 3, 4,
5 (Pythagoras theorem) method can be employed
for further layout of the anchorage blocks, sheave
anchorage foundation and tower base.
Repeat the same procedure in another station.
step 5
Figure 21
Figure 22
7.2 Excavation for Foundation and Anchor Block
Before starting the earthwork, the excavation
area should be marked out. While excavating in
the decomposed rock or firm ground, only the
planned area of the footing or anchor block should
be excavated. For unstable sites, the excavation
dimensions may be increased from bottom
outwards by stepping or sloping the excavation
sides.
If an excavation reveals a need to go deeper than
the recommended level, then a mass concrete
backfill should be used to bring the level back
to the soft level. The inclination of the sides
7.3 Construction of Masonry Wall
varies with earth quality. Exact limit should be
adhered to when excavating in rock or firm soil
to avoid the use of excessive masses of concrete.
Excavation deeper than 1.5 metres, especially
in unstable soil, should be braced or shored
using a standard method. The slope may be
banked if shoring is not possible but a safe back
slope must be maintained. A minimum slope
of 1:1 in non-cohesive materials to the slope
of 1:3 in well-consolidated materials should be
adopted to avoid the collapsing of the sides.
The masonry wall is constructed with cement
mortar. The cement mortar ratio of 1:6 is used in
the construction of walls for the anchorage blocks
where as the ratio may have to be increased up
to 1:4 in case of retaining wall, tower foundation
and parapet walls. The width of the wall should
be as per the design but minimum breadth of 30
centimetres should be maintained.